Erwin Schrödinger-Zentrum,
New build library centre, remodeled production plant,
in Berlin-Adlershof
 
Client:
Senatsverwaltung für Bau, Wohnen und Verkehr, Berlin
Senatsverwaltung für Wissenschaft und Forschung, Berlin
WISTA-Management GmbH
Rudower Chaussee 17
12489 Berlin
Mr. Pohlmann, Tel. o3o - 9o 13 93 2o o
 
Architects:
Dipl.-Ing. B. Gössler
mag. arch. D. Gössler
Dipl.-Ing. Kreienbaum
www.architekten-goessler.de
 
Construction period:  2000 - 2002
 
Total construction cost:  40.400.000 €
 
Fee structure:  III, low
 
Completed work stages:
HOAI, § 64, LP 1 to LP 6 and building physics/structural verifications (EnEV, acoustic and fire protection)
 
Construction type:
New build and conversion, integration of four listed production plant buildings.
Library centre of steel construction, remaining new buildings of reinforced concrete, solid construction.
Reinforced concrete and sectional steel used in conversion,
waterproof concrete basement, individual and strip foundations and slabs.
Erwin Schrödinger-Zentrum
Erwin Schrödinger-Zentrum, Bibliothek und Innenansicht
 
 
 
 
 
 

Projects FU-Berlin, Department of History Hall of Residence and
Student Union Building, TU-Berlin