Kreiskrankenhaus Salzwedel
New build ward block and treatment wing
 
Client:
Kreiskrankenhaus Salzwedel
Brunnenstr. 1
29410 Salzwedel
 
Architect:
Planungsring Dr. Pawlik
Bundesallee 87
12161 Berlin
www.planungsring.com
 
Construction period:
1. Construction stage 1993 - 1995
2. Construction stage 1998 - 2000
 
Total construction cost: 53.170.000 €
 
Fee structure:  III, low
 
Kreiskrankenhaus Salzwedel
Completed work stages:
HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation)
 
Construction type:
Solid construction, individual and strip foundations, waterproof concrete basement, floors, beams and supports in grid of 7.50 x 7.50 m of reinforced concrete, wooden roof construction