New build town house Niederwallstraße 33 in 10117 Berlin | |
Client: Frank Bohne Mohrenstraße 34 10117 Berlin Architect: Frank Bohne Mohrenstraße 34 10117 Berlin www.ib-bohne.de Construction period: 2007 Total cost in accordance with DIN 276: 189.210 € Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation) Construction type: Solid waterproofed construction, rising brick walls, reinforced concrete floors, raft foundation. |
|
Projects | Tower block Steglitzer Damm | Embassy of the Republic of Azerbaijan |