Berliner Wasserwerke (water utility), Jungfernheide plant New build laboratory building Motardstraße in Berlin-Spandau | |
Client: Berliner Wasserwerke, Building Dept. Hohenzollerndamm 45 10713 Berlin Architectural planning: Berliner Wasserwerke, Abt. Bau Hohenzollerndamm 45 10713 Berlin Construction period: 1985 - 1986 Total construction cost: 3.580.000 € |
|
Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics/structural verifications (EnEV, acoustic and fire protection) Construction type: Solid construction with clinker facade, full basement, foundations on elastically-supported slabs, reinforced concrete rising walls, floors and beams, waterproof basement, wooden roof truss |