New build housing complex in Konrad-Wolf-Str. / Bahnhofstr. / Große Leege Str. in 13003 Berlin-Hohenschönhausen | |
Client: Neues Berlin Wohnungsbaugenossenschaft Martenzeile 21 - 23 13053 Berlin Architect: Mayer und Grüneberg Pücklerstr. 32 10997 Berlin Construction period: 1994 - 1995 Total Construction cost: 11.900.000 € Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation) Construction type: Solid construction, waterproof basement walls and base slabs, rising walls of brick, reinforced concrete floors, lat roof, external walls with insulated facade system. |
|
Projets | Garden city Falkenberg | Residential and commercial development Hohenschönhausen |