DRK Kliniken Berlin-Köpenick Salvador Allende Straße 2 - 8 in 10623 Berlin, 2. construction stage new build house 4, partial remodeling house 2 and house 5.2 | |
Client: Zweite gemeinnützige Krankenhaus GmbH Deutsches Rotes Kreuz Schwesternschaft Berlin Brabanter Str.18-20 10713 Berlin Mr. Armbrust, Tel. 030 - 30 35 34 82 Architect: Sander u. Hofrichter Planungsgesellschaft mbH Hohenzollerndamm 125 - 126 14199 Berlin www.a-sh.de Planning and execution period: 2007 - 2010 Total cost in accordance with DIN 276: KG 300 - 400 : 15.187.652 € Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics/structural verifications (EnEV, acoustic and fire protection) Construction type: New build operation and treatment wing House 4: Basement - 3. floor, central sterilisation in basement, central equipment on 3. floor, solid reinforced concrete construction with perforated facade, column grid 7,20 x 7,20 m, partly with green roofing, basement and raft foundation waterproof, emergency staircases glazed and unheated, stabilisation through perforated facade. Conversion work in the adjacent old buildings, houses 1 and 5.2 |
|
|
Projects | DRK Kliniken Berlin-Mitte |