DRK Kliniken Berlin-Köpenick
Salvador Allende Straße 2 - 8 in 10623 Berlin, 2. construction stage
new build house 4, partial remodeling house 2 and house 5.2
 
Client:
Zweite gemeinnützige Krankenhaus GmbH
Deutsches Rotes Kreuz Schwesternschaft Berlin
Brabanter Str.18-20
10713 Berlin
Mr. Armbrust, Tel. 030 - 30 35 34 82
 
Architect:
Sander u. Hofrichter
Planungsgesellschaft mbH
Hohenzollerndamm 125 - 126
14199 Berlin
www.a-sh.de
 
Planning and execution period:  2007 - 2010
 
Total cost in accordance with DIN 276:
KG 300 - 400 :  15.187.652 €
 
Fee structure: III, low
 
Completed work stages:
HOAI, § 64, LP 1 to LP 6 and
building physics/structural verifications (EnEV, acoustic and fire protection)
 
Construction type:
New build operation and treatment wing House 4: Basement - 3. floor, central sterilisation in basement, central equipment on 3. floor,
solid reinforced concrete construction with perforated facade, column grid 7,20 x 7,20 m, partly with green roofing, basement and raft foundation waterproof, emergency staircases glazed and unheated, stabilisation through perforated facade.
Conversion work in the adjacent old buildings, houses 1 and 5.2
 
 

Projects DRK Kliniken Berlin-Mitte