New build / conversion of day care centre Kita Crellestr.
Crellestr. 16 - 17 in 10827 Berlin-Schöneberg
 
Client:
Bezirksamt Schöneberg
Hochbauamt
John-F.-Kennedy-Platz
10825 Berlin
 
Architect:
Gerd Ockert
Planungsgruppe Urbane Baukunst
Oranienstr. 58
10969 Berlin-Kreuzberg
 
Construction period:  1990 - 1991
 
Total construction cost:  7.670.000 €
 
Fee structure:  III, low
 
Completed work stages:
HOAI, § 64, LP 1 to LP 6 and
building physics/structural verifications (EnEV, acoustic and fire protection)
 
New build:
Solid construction,
brick walls,
concrete ceilings and floors,
barrel roof.
 
Conversion:
Existing ribbed ceilings restored and new reinforced concrete floors above ground floor level put in,
new wall break-throughs in the mews buildings,
remodeling work on ground and upper floors.