Behring Krankenhaus, new build main hospital building Gimpelsteig 9 in 14165 Berlin-Zehlendorf | |
Client: Krankenhausbetrieb von Berlin-Zehlendorf Berlin Architects: Prof. Gottfried Böhm und Steinigeweg, Köln Planungsring Dr. Pawlik, Berlin Hohenzollerndamm 125-128 14199 Berlin www.planungsring.com Construction period: 1992 - 1997 Total construction cost: 61.400.000 € Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation) Construction type: Solid reinforced concrete construction with covered inner courtyards (steel and glass), waterproof basement, individual and strip foundations |
|
Projects | St. Joseph Krankenhaus | Krankenhaus Salzwedel |