Behring Krankenhaus, new build main hospital building
Gimpelsteig 9 in 14165 Berlin-Zehlendorf
 
Client:
Krankenhausbetrieb von Berlin-Zehlendorf
Berlin
 
Architects:
Prof. Gottfried Böhm und Steinigeweg, Köln
Planungsring Dr. Pawlik, Berlin
Hohenzollerndamm 125-128
14199 Berlin
www.planungsring.com
 
Construction period:  1992 - 1997
 
Total construction cost:  61.400.000 €
 
Fee structure:  III, low
 
Completed work stages:
HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation)
 
Construction type:
Solid reinforced concrete construction
with covered inner courtyards (steel and glass),
waterproof basement,
individual and strip foundations
Behring Krankenhaus, Innenhof im Haupthaus
Behring Krankenhaus, Haupthaus

Projects St. Joseph Krankenhaus Krankenhaus Salzwedel